Viewing cable 09REYKJAVIK214, REYKJAVIK OIG COMPLIANCE UPDATE/REUEST FOR EXTENSION
Understanding cables
Every cable message consists of three parts:
- The top box shows each cables unique reference number, when and by whom it originally was sent, and what its initial classification was.
- The middle box contains the header information that is associated with the cable. It includes information about the receiver(s) as well as a general subject.
- The bottom box presents the body of the cable. The opening can contain a more specific subject, references to other cables (browse by origin to find them) or additional comment. This is followed by the main contents of the cable: a summary, a collection of specific topics and a comment section.
To understand the justification used for the classification of each cable, please use this
WikiSource article as reference.
Discussing cables
If you find meaningful or important information in a cable, please link directly to its unique reference number. Linking to a specific paragraph in the body of a cable is also possible by copying the appropriate link (to be found at theparagraph symbol). Please mark messages for social networking services like Twitter with the hash tags #cablegate and a hash containing the reference ID e.g. #09REYKJAVIK214.
VZCZCXYZ0012
PP RUEHWEB
DE RUEHRK #0214 3381544
ZNR UUUUU ZZH
P 041544Z DEC 09
FM AMEMBASSY REYKJAVIK
TO SECSTATE WASHDC PRIORITY 4230
UNCLAS REYKJAVIK 000214
SENSITIVE
SIPDIS
E.O. 12958: N/A
TAGS: ASIG ASEC ABLD IC
SUBJECT: REYKJAVIK OIG COMPLIANCE UPDATE/REUEST FOR EXTENSION
REF: A. STATE 2995, B. STATE085363, C. SIO-I-03-61
¶1. (SBU) Post is committd to closing Recommendation 2 in the OIG's
2003 eport (ref c) as soon as possible. Post continues to advise
the OIG on the status of the Perimeter ecurity Upgrade Project in
line with Recommendaton 2 in ref c. As previously reported, Post
hasbeen denied a permit by the city of Reykjavik to bild on the
property because of opposition by the neighbors in the vicinity of
the Mission.
¶2. SBU) Post is still awaiting the appointment of a Cief of
Mission, a process that has delayed a final decision on the
construction project. Due to an anticipated arrival of a new COM
sometime in spring 2010, Post requests an extension on the final
decision on the project until July 2010. This extension should
allow the incoming COM enough time to fully examine this complex
issue and make a determination on how to proceed.
¶3. (SBU) POC is Marco A. Fernandez, RSO.
Watson
Sem comentários:
Enviar um comentário